Royal Kalpataru, Ganapathy, Coimbatore
Special Features

Landscaped Relaxation space

Open well (120 feet depth)

Football turf

Indoor games

A/C Gym

Multipurpose Hall

Children’s Play Area

CCTV

24 x 7 Security

Swimming pool

Mini Theatre

Intercom

Generator Backup

Solar energy provision
Elevation
Specifications
Structure | RCC framed structure with Fly Ash bricks |
RCC | M25 grade mix |
Steel | Fe 500 grade ISI brand. |
Joineries | Main door will be of teakwood-panelled door and other doors will be of company made Flush doors with Lamination sheet finish. Toilet doors will be of water proof Flush door with Lamination finish on outer side and synthetic enamel paint finish on inner side. UPVC Sliding windows with mosquito net. |
Flooring | 2'9'' X 2'9'' or 2'0' X 4'0'' vitrified tiles of Nitco or Kajario or equivalent make. |
Toilet | Dadooing upto 8'0'' height. Flooring with Anti skid tiles, Flooring treated for waterproof, EWC (European water closets) of Jaquar or equivalent brand with concealed flush tank. Tap fittings - Jaquar or equivalent brand.E |
Electical | Three phase service with ELCB ( Earth Leakage Circuit Breaker) and Modular switches of Legrand or GOld Medal or equivalent. Cable-Finolex or RR cable or equivalent brand cable Outlets for A/C in all bed rooms and Hall. Outlets for TV in living hall and all bed rooms. Outlets for Telephone in living and all bed rooms. |
Paintings | Interior with acrylic emulsion (Royale) over fully putty, Main door frames and shutter are polished, main frames of other doors are polished and toilet door frames and door inside are painted with synthetic enamel paint with putty. |
Kitchen | Black granite working top with full nosing. Stainless steel sink with drain board. Dadooing upto 8’o'' height. |
Terrace | 300mm X 300mm cooling roof tiles (Oavet or AGL or equivalent). |
Mode of Payment
- On Booking - 10%
- Within 45 days of booking - 30%
- On completion of foundation - 10%
- On completion of Ground floor Roof - 10%
- On completion of I Roof - 10%
- On completion of II Roof - 10%
- On completion of Brick work & Plastering - 10%
- On completion of Flooring - 7%
- On Handing Over - 3%